Get exclusive volume discounts, bulk pricing updates, and new product alerts delivered directly to your inbox.
By subscribing, you agree to our Terms of Service and Privacy Policy.
Direct access to our certified experts
Get exclusive volume discounts, bulk pricing updates, and new product alerts delivered directly to your inbox.
By subscribing, you agree to our Terms of Service and Privacy Policy.
Direct access to our certified experts
The ST800 puts a high magnitude pulse between the neutral/hot leg or hot leg/ hot leg for any secondary service (120V, 208, 277, 480V). It cannot be fooled by telephone and cable television bonding often missed by continuous loading devices.
• Identify Bad Conductor(s) From the Transformer to the Meter Base
• Indicate Integrity of Neutral Conductor to Prevent Excessive House Ground Currents
• Locate Both Hot Legs and Neutral at the Pedestal and/or Transformer Blocks.
• Locate Bad Connectors on Overhead Spans
• Identify De-energized or Energized URD Primary Cable in a Manhole or Ditch if Secondary Power is Present
• Identify Energized Feed In/Out on Primary URD Transformers, Switches and Riser Poles if Secondary Power is Present
• ST800 comes standard with Small Clamps
Includes:
800 Amp Service Tester
Test Leads
Small Bag